Day 27: More Holes and a Frame
Saturday, 3 April 2010
So where was the rain, it was supposed to to be the worst day of the weekend and not a drop. After a a trip to do the weekly shop and a run to Argos to get a cheap router, it was on with the job. Even with half the morning gone the last two holes were cut in time for lunch.
After lunch I broke out the new router and finished the first window support frame in double quick time. This was then assembled to the inside of the side door window hole using O'Leary FC40 PU adhesive, this stuff apparently take about 24hours to go off but once it does is extremely strong.
Before calling it a day, I completed the a second frame which I plan to fit tomorrow before we go off to celebrate Easter Sunday with the family.
After lunch I broke out the new router and finished the first window support frame in double quick time. This was then assembled to the inside of the side door window hole using O'Leary FC40 PU adhesive, this stuff apparently take about 24hours to go off but once it does is extremely strong.
Before calling it a day, I completed the a second frame which I plan to fit tomorrow before we go off to celebrate Easter Sunday with the family.
0 comments:
Post a Comment