Day 30: Fourth Frame and More Insulation

Tuesday 6 April 2010

With Leng on a week's holiday and able to look after Bon-bon I have the opportunity to work on the van in the evening. This evening the first job was to glue and fit the fourth and penultimate window.

Fitting the frame was fairly quick and painless since the would had already been prepared and partially glued, and once installed I returned to work on the insulation. The first job was the insulation around the sliding door window, then the insulation around the kitchen window, with the offcuts being used to finish the panel above the seating area window.