Day 99: Bench Framing

Monday, 14 June 2010

After the weekend away the first job of the evening was to unload the van, though I have left the kites etc in the under bed locker, then it was on with the conversion.

Having done the drawings over the last bank holiday weekend when I was struck down with a cold, and produced a cutting list, I was able to get a good part of the wood cut before making a start on assembling it.

Using Fast Grab Instant PU glue which has a 1 minute grab time and an initial setting time of 5minutes, I was able to progress quite rapidly with the back section of the benches.

0 comments:

Recent Entries

Related Entries