Day 138: Kitchen cabinets part 4

Friday, 23 July 2010

Assembly, with near enough everything cut including all the joints this evening was spent gluing and clamping the whole structure together. It is rpoving eaiser to assemble the cabinet out side the van as I am more able to keep it square, puls there are section which I will need to route out which I would not be able to access if the assembly was in the van.

0 comments:

Recent Entries

Related Entries